EOL and EOSL plan for:

Agile X IS - 10.1" Industry Tablet PC

Type or order number: 17-A1Bx-1xx1/221x1xxx


Timelines

  • Last Time Buy:                 April 01st 2023
  • Last Time Delivery:          April 30th 2023
  • End of Life (EOL):             April 30th 2023
  • End of Support (EOSL):    April 30th 2026


All active configurations of Agile X IS (Zone 1 and Division 1) Tablet-PC series

  • with scan engine
  • with 4G/LTE
  • all operating system options
  • all Ex-certifications


Affected Ex certification:

  • UL – UL E226123
  • ATEX – DEMKO 16 ATEX 1803
  • IECEx – IECEx UL 16.0160 
  • local country versions based on ATEX/IECEx:
    • South Africa – UL-BR 20.1319
    • South Africa – MTEx 0711/19.0232
    • Brazil – UL-BR 20.1319
    • Russia – RU C-DE-BH02.B00212/19ilen


Alternative solution:

  • Agile S NI - 10.1" Industry Tablet PC (Zone 2/22 and Division 2)
  • Agile S - 10.1" Industry Tablet PC (non-ex)
  • BARTEC ET60/65EX2 Android Tablet - 10.1" (Zone 2/22 and Division 2)